Schedule 1(BASE3) : 
--------> credited hours     : 84.8333
--------> schedule cost      : 12600
--------> number of vacations: 16
Schedule 2(BASE3) : 
--------> credited hours     : 84.35
--------> schedule cost      : 6928.67
--------> number of vacations: 17
Schedule 3(BASE2) : 
--------> credited hours     : 83.6333
--------> schedule cost      : 7776.67
--------> number of vacations: 20
Schedule 4(BASE3) : 
--------> credited hours     : 83.25
--------> schedule cost      : 6579.67
--------> number of vacations: 19
Schedule 5(BASE2) : 
--------> credited hours     : 81.2333
--------> schedule cost      : 7137
--------> number of vacations: 20
Schedule 6(BASE3) : 
--------> credited hours     : 83.6333
--------> schedule cost      : 7828.67
--------> number of vacations: 19
Schedule 7(BASE2) : 
--------> credited hours     : 63.6167
--------> schedule cost      : 5667.67
--------> number of vacations: 12
Schedule 8(BASE1) : 
--------> credited hours     : 81.5833
--------> schedule cost      : 6375.67
--------> number of vacations: 21
Schedule 9(BASE1) : 
--------> credited hours     : 84.5
--------> schedule cost      : 5530
--------> number of vacations: 19
Schedule 10(BASE2) : 
--------> credited hours     : 84.9667
--------> schedule cost      : 7252.67
--------> number of vacations: 21
Schedule 11(BASE1) : 
--------> credited hours     : 82.5833
--------> schedule cost      : 4359
--------> number of vacations: 20
Schedule 12(BASE2) : 
--------> credited hours     : 84.8833
--------> schedule cost      : 8560.67
--------> number of vacations: 19
Schedule 13(BASE1) : 
--------> credited hours     : 81.8667
--------> schedule cost      : 7094.33
--------> number of vacations: 19
Schedule 14(BASE1) : 
--------> credited hours     : 84.8667
--------> schedule cost      : 5015.67
--------> number of vacations: 20
Schedule 15(BASE1) : 
--------> credited hours     : 79.9167
--------> schedule cost      : 5775.67
--------> number of vacations: 21
Schedule 16(BASE2) : 
--------> credited hours     : 79.9833
--------> schedule cost      : 4718
--------> number of vacations: 21
Schedule 17(BASE3) : 
--------> credited hours     : 83.6
--------> schedule cost      : 10865
--------> number of vacations: 17
Schedule 18(BASE2) : 
--------> credited hours     : 84.7167
--------> schedule cost      : 7989.33
--------> number of vacations: 19
Schedule 19(BASE1) : 
--------> credited hours     : 81.0167
--------> schedule cost      : 7342.33
--------> number of vacations: 21
Schedule 20(BASE1) : 
--------> credited hours     : 81.8667
--------> schedule cost      : 8747.67
--------> number of vacations: 22
Schedule 21(BASE1) : 
--------> credited hours     : 71.7667
--------> schedule cost      : 4215.67
--------> number of vacations: 23
Schedule 22(BASE3) : 
--------> credited hours     : 82.7
--------> schedule cost      : 8312.67
--------> number of vacations: 20
Schedule 23(BASE2) : 
--------> credited hours     : 84.4167
--------> schedule cost      : 6281.33
--------> number of vacations: 9
Schedule 24(BASE2) : 
--------> credited hours     : 84.8
--------> schedule cost      : 5237.67
--------> number of vacations: 21
Schedule 25(BASE2) : 
--------> credited hours     : 85
--------> schedule cost      : 6867
--------> number of vacations: 20
Schedule 26(BASE1) : 
--------> credited hours     : 83.9
--------> schedule cost      : 9982.33
--------> number of vacations: 18
Schedule 27(BASE2) : 
--------> credited hours     : 83.5667
--------> schedule cost      : 7118.67
--------> number of vacations: 15
Schedule 28(BASE1) : 
--------> credited hours     : 84.7333
--------> schedule cost      : 8136
--------> number of vacations: 20
Schedule 29(BASE1) : 
--------> credited hours     : 83.2
--------> schedule cost      : 5603
--------> number of vacations: 11
Schedule 30(BASE1) : 
--------> credited hours     : 80.6167
--------> schedule cost      : 5197.67
--------> number of vacations: 20
Schedule 31(BASE1) : 
--------> credited hours     : 83.4833
--------> schedule cost      : 4972
--------> number of vacations: 22
Schedule 32(BASE2) : 
--------> credited hours     : 82.7667
--------> schedule cost      : 6938.67
--------> number of vacations: 20
Schedule 33(BASE2) : 
--------> credited hours     : 83.9833
--------> schedule cost      : 7699.33
--------> number of vacations: 21
Schedule 34(BASE1) : 
--------> credited hours     : 79.7333
--------> schedule cost      : 8134.33
--------> number of vacations: 19
Schedule 35(BASE1) : 
--------> credited hours     : 84.7167
--------> schedule cost      : 8980.33
--------> number of vacations: 19
Schedule 36(BASE2) : 
--------> credited hours     : 84.55
--------> schedule cost      : 9684
--------> number of vacations: 19
Schedule 37(BASE1) : 
--------> credited hours     : 84.7333
--------> schedule cost      : 4081
--------> number of vacations: 21
Schedule 38(BASE2) : 
--------> credited hours     : 84.6333
--------> schedule cost      : 9162.67
--------> number of vacations: 19
Schedule 39(BASE2) : 
--------> credited hours     : 79.35
--------> schedule cost      : 6743.67
--------> number of vacations: 21
Schedule 40(BASE1) : 
--------> credited hours     : 78.3167
--------> schedule cost      : 4564.33
--------> number of vacations: 21
Schedule 41(BASE1) : 
--------> credited hours     : 81.7667
--------> schedule cost      : 5501.67
--------> number of vacations: 21
Schedule 42(BASE1) : 
--------> credited hours     : 82.7
--------> schedule cost      : 6601
--------> number of vacations: 18
Schedule 43(BASE2) : 
--------> credited hours     : 82.4167
--------> schedule cost      : 6349.33
--------> number of vacations: 20
Schedule 44(BASE1) : 
--------> credited hours     : 84.5333
--------> schedule cost      : 8557.67
--------> number of vacations: 19
Schedule 45(BASE1) : 
--------> credited hours     : 79.8667
--------> schedule cost      : 7762
--------> number of vacations: 19
Schedule 46(BASE3) : 
--------> credited hours     : 84.8833
--------> schedule cost      : 6172.33
--------> number of vacations: 19
Schedule 47(BASE1) : 
--------> credited hours     : 84.5
--------> schedule cost      : 4316.67
--------> number of vacations: 19
Schedule 48(BASE1) : 
--------> credited hours     : 84.4667
--------> schedule cost      : 7912
--------> number of vacations: 19
Schedule 49(BASE2) : 
--------> credited hours     : 85
--------> schedule cost      : 12438.3
--------> number of vacations: 16
Schedule 50(BASE2) : 
--------> credited hours     : 84.2167
--------> schedule cost      : 6811.67
--------> number of vacations: 20
Schedule 51(BASE2) : 
--------> credited hours     : 23.95
--------> schedule cost      : 1779.33
--------> number of vacations: 22
Schedule 52(BASE1) : 
--------> credited hours     : 83.8333
--------> schedule cost      : 8464
--------> number of vacations: 20
Schedule 53(BASE1) : 
--------> credited hours     : 84.4333
--------> schedule cost      : 3148
--------> number of vacations: 20
Schedule 54(BASE1) : 
--------> credited hours     : 84.8333
--------> schedule cost      : 6281.67
--------> number of vacations: 19
Schedule 55(BASE1) : 
--------> credited hours     : 82.3333
--------> schedule cost      : 6857.67
--------> number of vacations: 20
Schedule 56(BASE2) : 
--------> credited hours     : 84.0333
--------> schedule cost      : 7370.67
--------> number of vacations: 19
Schedule 57(BASE1) : 
--------> credited hours     : 76.5167
--------> schedule cost      : 6068.67
--------> number of vacations: 11
Schedule 58(BASE1) : 
--------> credited hours     : 84.4667
--------> schedule cost      : 6587
--------> number of vacations: 20
Schedule 59(BASE2) : 
--------> credited hours     : 81.15
--------> schedule cost      : 6795
--------> number of vacations: 21
Schedule 60(BASE1) : 
--------> credited hours     : 83.85
--------> schedule cost      : 6510.67
--------> number of vacations: 20
Schedule 61(BASE2) : 
--------> credited hours     : 84.1833
--------> schedule cost      : 6299.33
--------> number of vacations: 21
Schedule 62(BASE1) : 
--------> credited hours     : 83.1
--------> schedule cost      : 7554.33
--------> number of vacations: 20
Schedule 63(BASE2) : 
--------> credited hours     : 84.9833
--------> schedule cost      : 9603
--------> number of vacations: 19
Schedule 64(BASE2) : 
--------> credited hours     : 83.95
--------> schedule cost      : 9149.67
--------> number of vacations: 18
Schedule 65(BASE2) : 
--------> credited hours     : 83.45
--------> schedule cost      : 9102.67
--------> number of vacations: 20
Schedule 66(BASE2) : 
--------> credited hours     : 83.7667
--------> schedule cost      : 6665
--------> number of vacations: 12
Schedule 67(BASE2) : 
--------> credited hours     : 72.2
--------> schedule cost      : 7532.33
--------> number of vacations: 21
Schedule 68(BASE1) : 
--------> credited hours     : 81.6833
--------> schedule cost      : 7769
--------> number of vacations: 8
Schedule 69(BASE2) : 
--------> credited hours     : 83.7333
--------> schedule cost      : 9258.67
--------> number of vacations: 20
Schedule 70(BASE1) : 
--------> credited hours     : 82.8667
--------> schedule cost      : 6687.67
--------> number of vacations: 20
Schedule 71(BASE1) : 
--------> credited hours     : 82.3833
--------> schedule cost      : 3880.33
--------> number of vacations: 20
Schedule 72(BASE1) : 
--------> credited hours     : 84.4167
--------> schedule cost      : 8202.67
--------> number of vacations: 20
Schedule 73(BASE1) : 
--------> credited hours     : 84.6833
--------> schedule cost      : 6416.33
--------> number of vacations: 20
Schedule 74(BASE1) : 
--------> credited hours     : 84.4
--------> schedule cost      : 7032.33
--------> number of vacations: 21
Schedule 75(BASE3) : 
--------> credited hours     : 83.0833
--------> schedule cost      : 9682.33
--------> number of vacations: 18
Schedule 76(BASE2) : 
--------> credited hours     : 83.2167
--------> schedule cost      : 7782.67
--------> number of vacations: 20
Schedule 77(BASE1) : 
--------> credited hours     : 82.4333
--------> schedule cost      : 5939.33
--------> number of vacations: 21
Schedule 78(BASE2) : 
--------> credited hours     : 84.8833
--------> schedule cost      : 9294.67
--------> number of vacations: 19
Schedule 79(BASE2) : 
--------> credited hours     : 85
--------> schedule cost      : 7487.33
--------> number of vacations: 20
Schedule 80(BASE1) : 
--------> credited hours     : 84.8
--------> schedule cost      : 3785
--------> number of vacations: 21
Schedule 81(BASE2) : 
--------> credited hours     : 78.5833
--------> schedule cost      : 6514.67
--------> number of vacations: 21
Schedule 82(BASE1) : 
--------> credited hours     : 84.5667
--------> schedule cost      : 8085.33
--------> number of vacations: 19
Schedule 83(BASE2) : 
--------> credited hours     : 80.2167
--------> schedule cost      : 7468.33
--------> number of vacations: 20
Schedule 84(BASE2) : 
--------> credited hours     : 83.9667
--------> schedule cost      : 7873.33
--------> number of vacations: 21
Schedule 85(BASE1) : 
--------> credited hours     : 84.4833
--------> schedule cost      : 6171.33
--------> number of vacations: 18
Schedule 86(BASE1) : 
--------> credited hours     : 81.5167
--------> schedule cost      : 4789.33
--------> number of vacations: 21
Schedule 87(BASE1) : 
--------> credited hours     : 78.7833
--------> schedule cost      : 4693.33
--------> number of vacations: 22
Schedule 88(BASE2) : 
--------> credited hours     : 84.7833
--------> schedule cost      : 10402.3
--------> number of vacations: 19
Schedule 89(BASE2) : 
--------> credited hours     : 84.2833
--------> schedule cost      : 8839
--------> number of vacations: 21
Schedule 90(BASE2) : 
--------> credited hours     : 84.7167
--------> schedule cost      : 7337.67
--------> number of vacations: 20
Schedule 91(BASE2) : 
--------> credited hours     : 79.5833
--------> schedule cost      : 8951.33
--------> number of vacations: 20
Schedule 92(BASE2) : 
--------> credited hours     : 83.95
--------> schedule cost      : 6733.33
--------> number of vacations: 16
Schedule 93(BASE1) : 
--------> credited hours     : 82.3667
--------> schedule cost      : 5175.33
--------> number of vacations: 8
Schedule 94(BASE1) : 
--------> credited hours     : 84.3667
--------> schedule cost      : 5195
--------> number of vacations: 21
Schedule 95(BASE3) : 
--------> credited hours     : 81.8333
--------> schedule cost      : 6646
--------> number of vacations: 20
Schedule 96(BASE1) : 
--------> credited hours     : 83.9167
--------> schedule cost      : 6220.67
--------> number of vacations: 19
Schedule 97(BASE1) : 
--------> credited hours     : 82.15
--------> schedule cost      : 4625
--------> number of vacations: 20
Schedule 98(BASE2) : 
--------> credited hours     : 84.2667
--------> schedule cost      : 7694.33
--------> number of vacations: 18
Schedule 99(BASE1) : 
--------> credited hours     : 82.1
--------> schedule cost      : 7207
--------> number of vacations: 21
Schedule 100(BASE2) : 
--------> credited hours     : 84.3167
--------> schedule cost      : 8285
--------> number of vacations: 19
Schedule 101(BASE1) : 
--------> credited hours     : 84.1333
--------> schedule cost      : 6332.67
--------> number of vacations: 21
Schedule 102(BASE2) : 
--------> credited hours     : 83.8833
--------> schedule cost      : 5894.33
--------> number of vacations: 21
Schedule 103(BASE2) : 
--------> credited hours     : 80.0333
--------> schedule cost      : 5651.67
--------> number of vacations: 12
Schedule 104(BASE2) : 
--------> credited hours     : 83.4333
--------> schedule cost      : 8607
--------> number of vacations: 19
Schedule 105(BASE1) : 
--------> credited hours     : 79.75
--------> schedule cost      : 4729.33
--------> number of vacations: 21
Schedule 106(BASE1) : 
--------> credited hours     : 80.6833
--------> schedule cost      : 7553.33
--------> number of vacations: 21
Schedule 107(BASE1) : 
--------> credited hours     : 77.25
--------> schedule cost      : 6098.33
--------> number of vacations: 23
Schedule 108(BASE1) : 
--------> credited hours     : 82.9
--------> schedule cost      : 6428
--------> number of vacations: 19
Schedule 109(BASE1) : 
--------> credited hours     : 84.55
--------> schedule cost      : 5308.33
--------> number of vacations: 20
Schedule 110(BASE1) : 
--------> credited hours     : 84.55
--------> schedule cost      : 6220.67
--------> number of vacations: 19
Schedule 111(BASE1) : 
--------> credited hours     : 84.1333
--------> schedule cost      : 8129.67
--------> number of vacations: 20
Schedule 112(BASE2) : 
--------> credited hours     : 83.1
--------> schedule cost      : 8268.33
--------> number of vacations: 21
Schedule 113(BASE3) : 
--------> credited hours     : 82.1667
--------> schedule cost      : 7267
--------> number of vacations: 18
Schedule 114(BASE3) : 
--------> credited hours     : 84.5833
--------> schedule cost      : 9185.33
--------> number of vacations: 17
Schedule 115(BASE1) : 
--------> credited hours     : 80.8833
--------> schedule cost      : 9107
--------> number of vacations: 20
Schedule 116(BASE2) : 
--------> credited hours     : 8.88333
--------> schedule cost      : 72
--------> number of vacations: 25
Schedule 117(BASE2) : 
--------> credited hours     : 82.2333
--------> schedule cost      : 8804.67
--------> number of vacations: 19
Schedule 118(BASE2) : 
--------> credited hours     : 84.25
--------> schedule cost      : 7144
--------> number of vacations: 21
Schedule 119(BASE1) : 
--------> credited hours     : 84.7833
--------> schedule cost      : 6336.33
--------> number of vacations: 19
Schedule 120(BASE1) : 
--------> credited hours     : 84.5333
--------> schedule cost      : 5673.33
--------> number of vacations: 19
Schedule 121(BASE3) : 
--------> credited hours     : 84.2333
--------> schedule cost      : 6410
--------> number of vacations: 20
Schedule 122(BASE1) : 
--------> credited hours     : 79.9667
--------> schedule cost      : 6738
--------> number of vacations: 21
Schedule 123(BASE1) : 
--------> credited hours     : 80.5167
--------> schedule cost      : 5284
--------> number of vacations: 21
Schedule 124(BASE1) : 
--------> credited hours     : 82.8333
--------> schedule cost      : 9090.33
--------> number of vacations: 20
Schedule 125(BASE1) : 
--------> credited hours     : 82.6833
--------> schedule cost      : 7021
--------> number of vacations: 21
Schedule 126(BASE1) : 
--------> credited hours     : 78.8667
--------> schedule cost      : 4649
--------> number of vacations: 21
Schedule 127(BASE3) : 
--------> credited hours     : 82.9167
--------> schedule cost      : 9070
--------> number of vacations: 19
Schedule 128(BASE1) : 
--------> credited hours     : 84.0333
--------> schedule cost      : 6666.67
--------> number of vacations: 20
Schedule 129(BASE2) : 
--------> credited hours     : 83.5
--------> schedule cost      : 6846.33
--------> number of vacations: 20
Schedule 130(BASE2) : 
--------> credited hours     : 84.1333
--------> schedule cost      : 7432.67
--------> number of vacations: 20
Schedule 131(BASE2) : 
--------> credited hours     : 81.0667
--------> schedule cost      : 8875.67
--------> number of vacations: 20
Schedule 132(BASE2) : 
--------> credited hours     : 80.4167
--------> schedule cost      : 5766.67
--------> number of vacations: 10
Schedule 133(BASE2) : 
--------> credited hours     : 84.8167
--------> schedule cost      : 7086.67
--------> number of vacations: 21
Schedule 134(BASE3) : 
--------> credited hours     : 81.35
--------> schedule cost      : 9175.67
--------> number of vacations: 15
Schedule 135(BASE1) : 
--------> credited hours     : 83.6167
--------> schedule cost      : 6407.33
--------> number of vacations: 9
Schedule 136(BASE3) : 
--------> credited hours     : 83.25
--------> schedule cost      : 8325
--------> number of vacations: 18
Schedule 137(BASE1) : 
--------> credited hours     : 84.4
--------> schedule cost      : 6927.67
--------> number of vacations: 21
Schedule 138(BASE1) : 
--------> credited hours     : 82.7167
--------> schedule cost      : 6571.33
--------> number of vacations: 21
Schedule 139(BASE3) : 
--------> credited hours     : 84.6
--------> schedule cost      : 10491.3
--------> number of vacations: 17
Schedule 140(BASE1) : 
--------> credited hours     : 84.55
--------> schedule cost      : 6299.33
--------> number of vacations: 20
Schedule 141(BASE1) : 
--------> credited hours     : 79.45
--------> schedule cost      : 5963.33
--------> number of vacations: 20
Schedule 142(BASE2) : 
--------> credited hours     : 66.6167
--------> schedule cost      : 6684
--------> number of vacations: 23
Schedule 143(BASE1) : 
--------> credited hours     : 84.3333
--------> schedule cost      : 6807.67
--------> number of vacations: 20
Schedule 144(BASE2) : 
--------> credited hours     : 81.4
--------> schedule cost      : 6234
--------> number of vacations: 10
Schedule 145(BASE1) : 
--------> credited hours     : 73.6833
--------> schedule cost      : 4080
--------> number of vacations: 23
Schedule 146(BASE1) : 
--------> credited hours     : 84.55
--------> schedule cost      : 5832.33
--------> number of vacations: 20
Schedule 147(BASE1) : 
--------> credited hours     : 84.4667
--------> schedule cost      : 7913
--------> number of vacations: 19
Schedule 148(BASE2) : 
--------> credited hours     : 84.8167
--------> schedule cost      : 9297
--------> number of vacations: 19
Schedule 149(BASE3) : 
--------> credited hours     : 83.9333
--------> schedule cost      : 7582.33
--------> number of vacations: 19
Schedule 150(BASE1) : 
--------> credited hours     : 84.7833
--------> schedule cost      : 8509.33
--------> number of vacations: 20
Schedule 151(BASE1) : 
--------> credited hours     : 84.7
--------> schedule cost      : 6668.67
--------> number of vacations: 19
Schedule 152(BASE1) : 
--------> credited hours     : 84.35
--------> schedule cost      : 10172.7
--------> number of vacations: 18
Schedule 153(BASE1) : 
--------> credited hours     : 84.7167
--------> schedule cost      : 6523.33
--------> number of vacations: 20
Schedule 154(BASE3) : 
--------> credited hours     : 82.3333
--------> schedule cost      : 7963.67
--------> number of vacations: 16
Schedule 155(BASE3) : 
--------> credited hours     : 84.8
--------> schedule cost      : 7623.33
--------> number of vacations: 18
Schedule 156(BASE2) : 
--------> credited hours     : 81.45
--------> schedule cost      : 6417
--------> number of vacations: 7
Schedule 157(BASE1) : 
--------> credited hours     : 84.2333
--------> schedule cost      : 7637.33
--------> number of vacations: 20
Schedule 158(BASE3) : 
--------> credited hours     : 84.8333
--------> schedule cost      : 7748.33
--------> number of vacations: 18
Schedule 159(BASE3) : 
--------> credited hours     : 84.5333
--------> schedule cost      : 7867
--------> number of vacations: 17
Schedule 160(BASE1) : 
--------> credited hours     : 84.25
--------> schedule cost      : 7026
--------> number of vacations: 20
Schedule 161(BASE1) : 
--------> credited hours     : 84.95
--------> schedule cost      : 8191.67
--------> number of vacations: 19
Schedule 162(BASE3) : 
--------> credited hours     : 80.5833
--------> schedule cost      : 4288
--------> number of vacations: 8
Schedule 163(BASE1) : 
--------> credited hours     : 77.15
--------> schedule cost      : 7180.67
--------> number of vacations: 21
Schedule 164(BASE2) : 
--------> credited hours     : 82.95
--------> schedule cost      : 7300
--------> number of vacations: 21
Schedule 165(BASE1) : 
--------> credited hours     : 80.55
--------> schedule cost      : 3067.33
--------> number of vacations: 22
Schedule 166(BASE2) : 
--------> credited hours     : 80.5833
--------> schedule cost      : 7694.67
--------> number of vacations: 20
Schedule 167(BASE1) : 
--------> credited hours     : 84.5
--------> schedule cost      : 5088
--------> number of vacations: 22
Schedule 168(BASE1) : 
--------> credited hours     : 81.1167
--------> schedule cost      : 7725.67
--------> number of vacations: 19
Schedule 169(BASE1) : 
--------> credited hours     : 84.3167
--------> schedule cost      : 8861.67
--------> number of vacations: 12
Schedule 170(BASE1) : 
--------> credited hours     : 81.2833
--------> schedule cost      : 6042.67
--------> number of vacations: 20
Schedule 171(BASE3) : 
--------> credited hours     : 83.9833
--------> schedule cost      : 7250
--------> number of vacations: 18
Schedule 172(BASE1) : 
--------> credited hours     : 84.6333
--------> schedule cost      : 8276.33
--------> number of vacations: 19
Schedule 173(BASE1) : 
--------> credited hours     : 81.9667
--------> schedule cost      : 9346.33
--------> number of vacations: 17
Schedule 174(BASE2) : 
--------> credited hours     : 84.0333
--------> schedule cost      : 9129.33
--------> number of vacations: 19
Schedule 175(BASE1) : 
--------> credited hours     : 84.7667
--------> schedule cost      : 7060.67
--------> number of vacations: 20
Schedule 176(BASE2) : 
--------> credited hours     : 59.05
--------> schedule cost      : 4927.67
--------> number of vacations: 19
Schedule 177(BASE1) : 
--------> credited hours     : 83.5333
--------> schedule cost      : 5542
--------> number of vacations: 20
Schedule 178(BASE1) : 
--------> credited hours     : 81.5667
--------> schedule cost      : 5902.33
--------> number of vacations: 21
Schedule 179(BASE1) : 
--------> credited hours     : 84.95
--------> schedule cost      : 6868.33
--------> number of vacations: 19
Schedule 180(BASE3) : 
--------> credited hours     : 82.3333
--------> schedule cost      : 8048
--------> number of vacations: 19
Schedule 181(BASE2) : 
--------> credited hours     : 84.3667
--------> schedule cost      : 6304.33
--------> number of vacations: 20
Schedule 182(BASE1) : 
--------> credited hours     : 83.2167
--------> schedule cost      : 5585.67
--------> number of vacations: 22
Schedule 183(BASE1) : 
--------> credited hours     : 84.85
--------> schedule cost      : 3367.67
--------> number of vacations: 20
Schedule 184(BASE1) : 
--------> credited hours     : 36.5833
--------> schedule cost      : 2925.33
--------> number of vacations: 27
Schedule 185(BASE2) : 
--------> credited hours     : 83.3667
--------> schedule cost      : 7153.67
--------> number of vacations: 21
Schedule 186(BASE3) : 
--------> credited hours     : 63.9167
--------> schedule cost      : 6625.67
--------> number of vacations: 22
Schedule 187(BASE3) : 
--------> credited hours     : 84.45
--------> schedule cost      : 9534.33
--------> number of vacations: 20
Schedule 188(BASE2) : 
--------> credited hours     : 81.35
--------> schedule cost      : 6681.67
--------> number of vacations: 21
Schedule 189(BASE1) : 
--------> credited hours     : 82.2333
--------> schedule cost      : 7665.33
--------> number of vacations: 21
Schedule 190(BASE1) : 
--------> credited hours     : 79.8667
--------> schedule cost      : 8700.33
--------> number of vacations: 19
Schedule 191(BASE1) : 
--------> credited hours     : 84.4
--------> schedule cost      : 3255.67
--------> number of vacations: 22
Schedule 192(BASE1) : 
--------> credited hours     : 79.5667
--------> schedule cost      : 5302.33
--------> number of vacations: 21
Schedule 193(BASE3) : 
--------> credited hours     : 82.85
--------> schedule cost      : 5478.67
--------> number of vacations: 19
Schedule 194(BASE1) : 
--------> credited hours     : 84.5833
--------> schedule cost      : 4388
--------> number of vacations: 21
Schedule 195(BASE1) : 
--------> credited hours     : 84.9167
--------> schedule cost      : 5349
--------> number of vacations: 20
Schedule 196(BASE3) : 
--------> credited hours     : 83.2333
--------> schedule cost      : 9582.67
--------> number of vacations: 18
Schedule 197(BASE1) : 
--------> credited hours     : 82.2333
--------> schedule cost      : 6413
--------> number of vacations: 21
Schedule 198(BASE1) : 
--------> credited hours     : 84.8667
--------> schedule cost      : 6530.33
--------> number of vacations: 19
Schedule 199(BASE1) : 
--------> credited hours     : 84.7167
--------> schedule cost      : 8452.67
--------> number of vacations: 19
Schedule 200(BASE1) : 
--------> credited hours     : 83.4167
--------> schedule cost      : 10408.7
--------> number of vacations: 19
Schedule 201(BASE1) : 
--------> credited hours     : 81.4
--------> schedule cost      : 6259
--------> number of vacations: 20
Schedule 202(BASE1) : 
--------> credited hours     : 84.9
--------> schedule cost      : 8781.33
--------> number of vacations: 20
Schedule 203(BASE3) : 
--------> credited hours     : 84.0167
--------> schedule cost      : 6437.67
--------> number of vacations: 19
Schedule 204(BASE1) : 
--------> credited hours     : 84.9167
--------> schedule cost      : 9096
--------> number of vacations: 20
Schedule 205(BASE1) : 
--------> credited hours     : 84.8
--------> schedule cost      : 5249
--------> number of vacations: 14
Schedule 206(BASE1) : 
--------> credited hours     : 71.4167
--------> schedule cost      : 4606.33
--------> number of vacations: 22
Schedule 207(BASE2) : 
--------> credited hours     : 84.8333
--------> schedule cost      : 6394
--------> number of vacations: 20
Schedule 208(BASE3) : 
--------> credited hours     : 83.6833
--------> schedule cost      : 10335.7
--------> number of vacations: 19
Schedule 209(BASE1) : 
--------> credited hours     : 75.95
--------> schedule cost      : 8474.33
--------> number of vacations: 21
Schedule 210(BASE1) : 
--------> credited hours     : 81.5667
--------> schedule cost      : 5268.33
--------> number of vacations: 20
Schedule 211(BASE2) : 
--------> credited hours     : 82.5167
--------> schedule cost      : 6846.67
--------> number of vacations: 20
Schedule 212(BASE2) : 
--------> credited hours     : 81.3833
--------> schedule cost      : 6983
--------> number of vacations: 20
Schedule 213(BASE3) : 
--------> credited hours     : 78.6167
--------> schedule cost      : 6642.33
--------> number of vacations: 19
Schedule 214(BASE1) : 
--------> credited hours     : 84.9833
--------> schedule cost      : 9048.33
--------> number of vacations: 19
Schedule 215(BASE1) : 
--------> credited hours     : 82.6667
--------> schedule cost      : 5514
--------> number of vacations: 15
Schedule 216(BASE3) : 
--------> credited hours     : 81.3833
--------> schedule cost      : 7485.33
--------> number of vacations: 8
Schedule 217(BASE3) : 
--------> credited hours     : 80.9
--------> schedule cost      : 4180
--------> number of vacations: 21
Schedule 218(BASE1) : 
--------> credited hours     : 79.2333
--------> schedule cost      : 5595.33
--------> number of vacations: 22
Schedule 219(BASE1) : 
--------> credited hours     : 75.2167
--------> schedule cost      : 3113.67
--------> number of vacations: 21
Schedule 220(BASE1) : 
--------> credited hours     : 83.9333
--------> schedule cost      : 4712.67
--------> number of vacations: 21
Schedule 221(BASE3) : 
--------> credited hours     : 81.8333
--------> schedule cost      : 10714.7
--------> number of vacations: 18
Schedule 222(BASE1) : 
--------> credited hours     : 85
--------> schedule cost      : 5825
--------> number of vacations: 20
Schedule 223(BASE2) : 
--------> credited hours     : 83.4833
--------> schedule cost      : 7126.67
--------> number of vacations: 19
Schedule 224(BASE1) : 
--------> credited hours     : 83.85
--------> schedule cost      : 5116.67
--------> number of vacations: 20
Schedule 225(BASE1) : 
--------> credited hours     : 84.8333
--------> schedule cost      : 10908.3
--------> number of vacations: 19
Schedule 226(BASE1) : 
--------> credited hours     : 83.7
--------> schedule cost      : 6806
--------> number of vacations: 21
Schedule 227(BASE1) : 
--------> credited hours     : 84.1167
--------> schedule cost      : 5645.33
--------> number of vacations: 21
Schedule 228(BASE1) : 
--------> credited hours     : 84.7167
--------> schedule cost      : 5650.67
--------> number of vacations: 18
Schedule 229(BASE2) : 
--------> credited hours     : 84.7167
--------> schedule cost      : 8536.67
--------> number of vacations: 19
Schedule 230(BASE1) : 
--------> credited hours     : 83.0667
--------> schedule cost      : 7557.33
--------> number of vacations: 22
Schedule 231(BASE2) : 
--------> credited hours     : 84.6167
--------> schedule cost      : 10034.3
--------> number of vacations: 19
Schedule 232(BASE1) : 
--------> credited hours     : 83.85
--------> schedule cost      : 4674
--------> number of vacations: 10
Schedule 233(BASE1) : 
--------> credited hours     : 77.3833
--------> schedule cost      : 7698
--------> number of vacations: 21
Schedule 234(BASE1) : 
--------> credited hours     : 81.7333
--------> schedule cost      : 7583.67
--------> number of vacations: 20
Schedule 235(BASE2) : 
--------> credited hours     : 84.5333
--------> schedule cost      : 9083.67
--------> number of vacations: 20
Schedule 236(BASE1) : 
--------> credited hours     : 82.2333
--------> schedule cost      : 5186.67
--------> number of vacations: 20
Schedule 237(BASE1) : 
--------> credited hours     : 84.1333
--------> schedule cost      : 3626
--------> number of vacations: 20
Schedule 238(BASE2) : 
--------> credited hours     : 81.25
--------> schedule cost      : 7613.67
--------> number of vacations: 21
Schedule 239(BASE1) : 
--------> credited hours     : 84.2833
--------> schedule cost      : 9978.33
--------> number of vacations: 19
Schedule 240(BASE1) : 
--------> credited hours     : 82.2167
--------> schedule cost      : 6335
--------> number of vacations: 20
Schedule 241(BASE3) : 
--------> credited hours     : 82.2833
--------> schedule cost      : 6152
--------> number of vacations: 19
Schedule 242(BASE3) : 
--------> credited hours     : 72.2833
--------> schedule cost      : 8437.33
--------> number of vacations: 7
Schedule 243(BASE1) : 
--------> credited hours     : 84.1333
--------> schedule cost      : 5451.33
--------> number of vacations: 22
Schedule 244(BASE2) : 
--------> credited hours     : 82.95
--------> schedule cost      : 6706
--------> number of vacations: 21
Schedule 245(BASE1) : 
--------> credited hours     : 82.2167
--------> schedule cost      : 6733
--------> number of vacations: 18
Schedule 246(BASE2) : 
--------> credited hours     : 82.9333
--------> schedule cost      : 6734
--------> number of vacations: 21
Schedule 247(BASE1) : 
--------> credited hours     : 84.5667
--------> schedule cost      : 7264
--------> number of vacations: 19
Schedule 248(BASE1) : 
--------> credited hours     : 84.8167
--------> schedule cost      : 6775.33
--------> number of vacations: 19
Schedule 249(BASE2) : 
--------> credited hours     : 82.35
--------> schedule cost      : 7794.33
--------> number of vacations: 20
Schedule 250(BASE1) : 
--------> credited hours     : 84.05
--------> schedule cost      : 2516.33
--------> number of vacations: 19
Schedule 251(BASE3) : 
--------> credited hours     : 84.7833
--------> schedule cost      : 8596.67
--------> number of vacations: 17
Schedule 252(BASE1) : 
--------> credited hours     : 83.7667
--------> schedule cost      : 3205.67
--------> number of vacations: 22
Schedule 253(BASE2) : 
--------> credited hours     : 82.8333
--------> schedule cost      : 7430.67
--------> number of vacations: 21
Schedule 254(BASE3) : 
--------> credited hours     : 83.1
--------> schedule cost      : 7888.33
--------> number of vacations: 19
Schedule 255(BASE3) : 
--------> credited hours     : 82.7333
--------> schedule cost      : 6898
--------> number of vacations: 18
Schedule 256(BASE1) : 
--------> credited hours     : 84.8333
--------> schedule cost      : 7628
--------> number of vacations: 20
Schedule 257(BASE2) : 
--------> credited hours     : 84.7667
--------> schedule cost      : 7877.67
--------> number of vacations: 20
Schedule 258(BASE1) : 
--------> credited hours     : 84.3333
--------> schedule cost      : 5687.33
--------> number of vacations: 20
Schedule 259(BASE2) : 
--------> credited hours     : 80.3167
--------> schedule cost      : 7479
--------> number of vacations: 20
Schedule 260(BASE2) : 
--------> credited hours     : 57.1
--------> schedule cost      : 3334
--------> number of vacations: 16
Schedule 261(BASE3) : 
--------> credited hours     : 84.55
--------> schedule cost      : 7681.33
--------> number of vacations: 15
Schedule 262(BASE1) : 
--------> credited hours     : 81.8833
--------> schedule cost      : 5485
--------> number of vacations: 21
Schedule 263(BASE1) : 
--------> credited hours     : 83.35
--------> schedule cost      : 10032.3
--------> number of vacations: 20
Schedule 264(BASE1) : 
--------> credited hours     : 84.7
--------> schedule cost      : 5888.67
--------> number of vacations: 10
Schedule 265(BASE2) : 
--------> credited hours     : 80.4333
--------> schedule cost      : 6926.33
--------> number of vacations: 20
Schedule 266(BASE1) : 
--------> credited hours     : 84.65
--------> schedule cost      : 12225.7
--------> number of vacations: 16
Schedule 267(BASE2) : 
--------> credited hours     : 66.9833
--------> schedule cost      : 5508.33
--------> number of vacations: 12
Schedule 268(BASE1) : 
--------> credited hours     : 71.7667
--------> schedule cost      : 4123.33
--------> number of vacations: 23
Schedule 269(BASE2) : 
--------> credited hours     : 84.4833
--------> schedule cost      : 8467.33
--------> number of vacations: 19
Schedule 270(BASE1) : 
--------> credited hours     : 80.1667
--------> schedule cost      : 5084.33
--------> number of vacations: 21
Schedule 271(BASE1) : 
--------> credited hours     : 83.3
--------> schedule cost      : 7850
--------> number of vacations: 20
Schedule 272(BASE2) : 
--------> credited hours     : 81.0333
--------> schedule cost      : 7565
--------> number of vacations: 21
Schedule 273(BASE2) : 
--------> credited hours     : 84.4
--------> schedule cost      : 7384.33
--------> number of vacations: 20
Schedule 274(BASE2) : 
--------> credited hours     : 80.75
--------> schedule cost      : 6944.67
--------> number of vacations: 16
Schedule 275(BASE3) : 
--------> credited hours     : 84.6
--------> schedule cost      : 8030
--------> number of vacations: 18
Schedule 276(BASE2) : 
--------> credited hours     : 80.9833
--------> schedule cost      : 8851.33
--------> number of vacations: 20
Schedule 277(BASE2) : 
--------> credited hours     : 84.2333
--------> schedule cost      : 9098.33
--------> number of vacations: 19
Schedule 278(BASE2) : 
--------> credited hours     : 83.6833
--------> schedule cost      : 8439.67
--------> number of vacations: 19
Schedule 279(BASE2) : 
--------> credited hours     : 84.5333
--------> schedule cost      : 8092
--------> number of vacations: 20
Schedule 280(BASE3) : 
--------> credited hours     : 82.15
--------> schedule cost      : 10475.7
--------> number of vacations: 17
Schedule 281(BASE3) : 
--------> credited hours     : 84.0167
--------> schedule cost      : 11518
--------> number of vacations: 18
Schedule 282(BASE2) : 
--------> credited hours     : 82.9167
--------> schedule cost      : 8357.67
--------> number of vacations: 21
Schedule 283(BASE1) : 
--------> credited hours     : 84
--------> schedule cost      : 6732.67
--------> number of vacations: 20
Schedule 284(BASE1) : 
--------> credited hours     : 83.6833
--------> schedule cost      : 11514.7
--------> number of vacations: 19
Schedule 285(BASE3) : 
--------> credited hours     : 81.4333
--------> schedule cost      : 4551.67
--------> number of vacations: 20
Schedule 286(BASE1) : 
--------> credited hours     : 81.7167
--------> schedule cost      : 6521
--------> number of vacations: 21
Schedule 287(BASE3) : 
--------> credited hours     : 84.95
--------> schedule cost      : 6278.67
--------> number of vacations: 18
Schedule 288(BASE1) : 
--------> credited hours     : 83.15
--------> schedule cost      : 6687.33
--------> number of vacations: 21
Schedule 289(BASE2) : 
--------> credited hours     : 83.65
--------> schedule cost      : 7186
--------> number of vacations: 21
Schedule 290(BASE1) : 
--------> credited hours     : 57.4167
--------> schedule cost      : 4007.67
--------> number of vacations: 24
Schedule 291(BASE1) : 
--------> credited hours     : 76.45
--------> schedule cost      : 5291
--------> number of vacations: 22
Schedule 292(BASE2) : 
--------> credited hours     : 80.7
--------> schedule cost      : 5012.67
--------> number of vacations: 22
Schedule 293(BASE1) : 
--------> credited hours     : 72.4833
--------> schedule cost      : 4352.33
--------> number of vacations: 22
Schedule 294(BASE3) : 
--------> credited hours     : 77.4
--------> schedule cost      : 2798.33
--------> number of vacations: 21
Schedule 295(BASE1) : 
--------> credited hours     : 81.9833
--------> schedule cost      : 3540.67
--------> number of vacations: 22
Schedule 296(BASE3) : 
--------> credited hours     : 73.9
--------> schedule cost      : 6883
--------> number of vacations: 22
Schedule 297(BASE3) : 
--------> credited hours     : 84.9333
--------> schedule cost      : 11703.7
--------> number of vacations: 17
Schedule 298(BASE3) : 
--------> credited hours     : 84.5833
--------> schedule cost      : 7068.33
--------> number of vacations: 18
Schedule 299(BASE2) : 
--------> credited hours     : 84.8833
--------> schedule cost      : 5228.33
--------> number of vacations: 20
Schedule 300(BASE2) : 
--------> credited hours     : 85
--------> schedule cost      : 8838.33
--------> number of vacations: 19
Schedule 301(BASE2) : 
--------> credited hours     : 84.3833
--------> schedule cost      : 7983
--------> number of vacations: 20
Schedule 302(BASE3) : 
--------> credited hours     : 84.3667
--------> schedule cost      : 6938.67
--------> number of vacations: 18
Schedule 303(BASE3) : 
--------> credited hours     : 80.5833
--------> schedule cost      : 9933
--------> number of vacations: 17
--------------------------------------------------------------
--------------------------------------------------------------
The average of the credited hours for this instance :81.6535
The average of the days off for this instance :19.1617
The minimum of the credited hours for this instance :8.88333
The maximum of the credited hours for this instance :85
--------------------------------------------------------------
--------------------------------------------------------------
--------------------------------------------------------------
The total cost for this instance   			:2.11276e+06