Schedule 1(BASE2) : 
--------> credited hours     : 84.3
--------> schedule cost      : 5273.67
--------> number of vacations: 18
Schedule 2(BASE2) : 
--------> credited hours     : 64.05
--------> schedule cost      : 6419
--------> number of vacations: 22
Schedule 3(BASE2) : 
--------> credited hours     : 43.1333
--------> schedule cost      : 3988
--------> number of vacations: 24
Schedule 4(BASE2) : 
--------> credited hours     : 81.7833
--------> schedule cost      : 3895.67
--------> number of vacations: 21
Schedule 5(BASE3) : 
--------> credited hours     : 83.1667
--------> schedule cost      : 5723.67
--------> number of vacations: 15
Schedule 6(BASE2) : 
--------> credited hours     : 81.4333
--------> schedule cost      : 4412.33
--------> number of vacations: 19
Schedule 7(BASE1) : 
--------> credited hours     : 73.4667
--------> schedule cost      : 5671.33
--------> number of vacations: 21
Schedule 8(BASE2) : 
--------> credited hours     : 84.3167
--------> schedule cost      : 6131.67
--------> number of vacations: 20
Schedule 9(BASE2) : 
--------> credited hours     : 57.8167
--------> schedule cost      : 3822.33
--------> number of vacations: 14
Schedule 10(BASE2) : 
--------> credited hours     : 84.8333
--------> schedule cost      : 5058.67
--------> number of vacations: 19
Schedule 11(BASE1) : 
--------> credited hours     : 54.4833
--------> schedule cost      : 3614.33
--------> number of vacations: 23
Schedule 12(BASE2) : 
--------> credited hours     : 51.9167
--------> schedule cost      : 3489
--------> number of vacations: 24
Schedule 13(BASE1) : 
--------> credited hours     : 83.85
--------> schedule cost      : 4028
--------> number of vacations: 19
Schedule 14(BASE3) : 
--------> credited hours     : 69.1833
--------> schedule cost      : 5356.67
--------> number of vacations: 11
Schedule 15(BASE1) : 
--------> credited hours     : 76.6
--------> schedule cost      : 4243
--------> number of vacations: 20
Schedule 16(BASE2) : 
--------> credited hours     : 80.4
--------> schedule cost      : 2848.33
--------> number of vacations: 21
Schedule 17(BASE2) : 
--------> credited hours     : 82.1333
--------> schedule cost      : 5705.33
--------> number of vacations: 20
Schedule 18(BASE2) : 
--------> credited hours     : 67.25
--------> schedule cost      : 4643.33
--------> number of vacations: 22
Schedule 19(BASE2) : 
--------> credited hours     : 66.3333
--------> schedule cost      : 4961
--------> number of vacations: 21
Schedule 20(BASE3) : 
--------> credited hours     : 65.2667
--------> schedule cost      : 6763
--------> number of vacations: 19
Schedule 21(BASE2) : 
--------> credited hours     : 78.4167
--------> schedule cost      : 6470
--------> number of vacations: 20
Schedule 22(BASE2) : 
--------> credited hours     : 64.3
--------> schedule cost      : 4570
--------> number of vacations: 17
Schedule 23(BASE1) : 
--------> credited hours     : 82.1833
--------> schedule cost      : 7094
--------> number of vacations: 19
Schedule 24(BASE2) : 
--------> credited hours     : 51.5833
--------> schedule cost      : 5857.33
--------> number of vacations: 23
Schedule 25(BASE2) : 
--------> credited hours     : 81.75
--------> schedule cost      : 4218.33
--------> number of vacations: 21
Schedule 26(BASE2) : 
--------> credited hours     : 78.6667
--------> schedule cost      : 6691.67
--------> number of vacations: 19
Schedule 27(BASE2) : 
--------> credited hours     : 84.3
--------> schedule cost      : 5984
--------> number of vacations: 20
Schedule 28(BASE1) : 
--------> credited hours     : 74.0667
--------> schedule cost      : 4376.67
--------> number of vacations: 19
Schedule 29(BASE2) : 
--------> credited hours     : 74.6667
--------> schedule cost      : 7010.67
--------> number of vacations: 19
Schedule 30(BASE1) : 
--------> credited hours     : 50.6
--------> schedule cost      : 4284.33
--------> number of vacations: 17
Schedule 31(BASE2) : 
--------> credited hours     : 23.6833
--------> schedule cost      : 2225
--------> number of vacations: 19
Schedule 32(BASE2) : 
--------> credited hours     : 83.4333
--------> schedule cost      : 8506.33
--------> number of vacations: 18
Schedule 33(BASE3) : 
--------> credited hours     : 84.8667
--------> schedule cost      : 7382.33
--------> number of vacations: 11
Schedule 34(BASE2) : 
--------> credited hours     : 71.6167
--------> schedule cost      : 5815.33
--------> number of vacations: 21
Schedule 35(BASE1) : 
--------> credited hours     : 73.9333
--------> schedule cost      : 4046.67
--------> number of vacations: 22
Schedule 36(BASE3) : 
--------> credited hours     : 78.1833
--------> schedule cost      : 8488.33
--------> number of vacations: 16
Schedule 37(BASE1) : 
--------> credited hours     : 70.0333
--------> schedule cost      : 3981.67
--------> number of vacations: 22
Schedule 38(BASE2) : 
--------> credited hours     : 83.65
--------> schedule cost      : 5804
--------> number of vacations: 20
Schedule 39(BASE2) : 
--------> credited hours     : 75.95
--------> schedule cost      : 4833.33
--------> number of vacations: 21
Schedule 40(BASE1) : 
--------> credited hours     : 83.8667
--------> schedule cost      : 5858
--------> number of vacations: 19
Schedule 41(BASE3) : 
--------> credited hours     : 84.1333
--------> schedule cost      : 7081.67
--------> number of vacations: 15
Schedule 42(BASE3) : 
--------> credited hours     : 76.5833
--------> schedule cost      : 6312.33
--------> number of vacations: 18
Schedule 43(BASE1) : 
--------> credited hours     : 81.4833
--------> schedule cost      : 5848
--------> number of vacations: 15
Schedule 44(BASE2) : 
--------> credited hours     : 63.1667
--------> schedule cost      : 6641.67
--------> number of vacations: 21
Schedule 45(BASE1) : 
--------> credited hours     : 60.7667
--------> schedule cost      : 5563
--------> number of vacations: 23
Schedule 46(BASE3) : 
--------> credited hours     : 84
--------> schedule cost      : 9723.33
--------> number of vacations: 16
Schedule 47(BASE3) : 
--------> credited hours     : 64.7833
--------> schedule cost      : 6504
--------> number of vacations: 13
Schedule 48(BASE2) : 
--------> credited hours     : 81.0333
--------> schedule cost      : 7959.33
--------> number of vacations: 15
Schedule 49(BASE1) : 
--------> credited hours     : 79.4
--------> schedule cost      : 7470.67
--------> number of vacations: 20
Schedule 50(BASE1) : 
--------> credited hours     : 77.1
--------> schedule cost      : 3581
--------> number of vacations: 22
Schedule 51(BASE2) : 
--------> credited hours     : 83.6667
--------> schedule cost      : 4773.67
--------> number of vacations: 20
Schedule 52(BASE3) : 
--------> credited hours     : 84.2833
--------> schedule cost      : 6090
--------> number of vacations: 16
Schedule 53(BASE2) : 
--------> credited hours     : 78.5667
--------> schedule cost      : 6669.67
--------> number of vacations: 20
Schedule 54(BASE2) : 
--------> credited hours     : 83.6833
--------> schedule cost      : 4283
--------> number of vacations: 20
Schedule 55(BASE1) : 
--------> credited hours     : 67.1333
--------> schedule cost      : 3060
--------> number of vacations: 20
Schedule 56(BASE3) : 
--------> credited hours     : 59.4667
--------> schedule cost      : 5070
--------> number of vacations: 13
Schedule 57(BASE1) : 
--------> credited hours     : 49.5333
--------> schedule cost      : 3483
--------> number of vacations: 23
Schedule 58(BASE2) : 
--------> credited hours     : 82.2333
--------> schedule cost      : 5676.67
--------> number of vacations: 19
Schedule 59(BASE2) : 
--------> credited hours     : 74.9667
--------> schedule cost      : 4868
--------> number of vacations: 20
Schedule 60(BASE1) : 
--------> credited hours     : 49.4
--------> schedule cost      : 3195
--------> number of vacations: 18
Schedule 61(BASE2) : 
--------> credited hours     : 83.05
--------> schedule cost      : 6091.67
--------> number of vacations: 19
Schedule 62(BASE1) : 
--------> credited hours     : 84.85
--------> schedule cost      : 6231
--------> number of vacations: 16
Schedule 63(BASE1) : 
--------> credited hours     : 82.2
--------> schedule cost      : 5647.33
--------> number of vacations: 16
Schedule 64(BASE2) : 
--------> credited hours     : 84.3
--------> schedule cost      : 5176
--------> number of vacations: 20
Schedule 65(BASE2) : 
--------> credited hours     : 79.05
--------> schedule cost      : 7276.33
--------> number of vacations: 20
Schedule 66(BASE3) : 
--------> credited hours     : 48.3
--------> schedule cost      : 4535
--------> number of vacations: 11
Schedule 67(BASE1) : 
--------> credited hours     : 51.7333
--------> schedule cost      : 3954.67
--------> number of vacations: 23
Schedule 68(BASE1) : 
--------> credited hours     : 80.2
--------> schedule cost      : 5557.67
--------> number of vacations: 20
Schedule 69(BASE1) : 
--------> credited hours     : 84.5333
--------> schedule cost      : 2948.33
--------> number of vacations: 18
Schedule 70(BASE2) : 
--------> credited hours     : 67.15
--------> schedule cost      : 4203.67
--------> number of vacations: 22
Schedule 71(BASE2) : 
--------> credited hours     : 84.7167
--------> schedule cost      : 4675
--------> number of vacations: 20
Schedule 72(BASE2) : 
--------> credited hours     : 68.2667
--------> schedule cost      : 7680
--------> number of vacations: 20
Schedule 73(BASE2) : 
--------> credited hours     : 83.9
--------> schedule cost      : 4976
--------> number of vacations: 20
Schedule 74(BASE2) : 
--------> credited hours     : 83.25
--------> schedule cost      : 3670.67
--------> number of vacations: 21
Schedule 75(BASE1) : 
--------> credited hours     : 73
--------> schedule cost      : 2518
--------> number of vacations: 21
Schedule 76(BASE1) : 
--------> credited hours     : 71.9
--------> schedule cost      : 4540.33
--------> number of vacations: 22
Schedule 77(BASE2) : 
--------> credited hours     : 49.9333
--------> schedule cost      : 3944.33
--------> number of vacations: 24
Schedule 78(BASE1) : 
--------> credited hours     : 71.9
--------> schedule cost      : 2480.33
--------> number of vacations: 21
Schedule 79(BASE2) : 
--------> credited hours     : 53
--------> schedule cost      : 4558.67
--------> number of vacations: 22
Schedule 80(BASE2) : 
--------> credited hours     : 83.8
--------> schedule cost      : 4837
--------> number of vacations: 18
Schedule 81(BASE2) : 
--------> credited hours     : 84.8167
--------> schedule cost      : 8169.33
--------> number of vacations: 16
Schedule 82(BASE1) : 
--------> credited hours     : 76.4833
--------> schedule cost      : 3489
--------> number of vacations: 21
Schedule 83(BASE1) : 
--------> credited hours     : 74.65
--------> schedule cost      : 4020.33
--------> number of vacations: 20
Schedule 84(BASE2) : 
--------> credited hours     : 84.2167
--------> schedule cost      : 2514.67
--------> number of vacations: 21
Schedule 85(BASE2) : 
--------> credited hours     : 80.2333
--------> schedule cost      : 3847
--------> number of vacations: 21
Schedule 86(BASE2) : 
--------> credited hours     : 83.35
--------> schedule cost      : 4269
--------> number of vacations: 21
Schedule 87(BASE3) : 
--------> credited hours     : 75.9167
--------> schedule cost      : 6124
--------> number of vacations: 17
Schedule 88(BASE1) : 
--------> credited hours     : 70.3667
--------> schedule cost      : 5669.67
--------> number of vacations: 21
Schedule 89(BASE1) : 
--------> credited hours     : 82.05
--------> schedule cost      : 5295.67
--------> number of vacations: 20
Schedule 90(BASE2) : 
--------> credited hours     : 78.9
--------> schedule cost      : 3658.67
--------> number of vacations: 18
Schedule 91(BASE1) : 
--------> credited hours     : 80.3167
--------> schedule cost      : 4338.33
--------> number of vacations: 13
Schedule 92(BASE2) : 
--------> credited hours     : 70.55
--------> schedule cost      : 4990.33
--------> number of vacations: 22
Schedule 93(BASE2) : 
--------> credited hours     : 81.3667
--------> schedule cost      : 7035.33
--------> number of vacations: 19
Schedule 94(BASE2) : 
--------> credited hours     : 80.6833
--------> schedule cost      : 4872.67
--------> number of vacations: 20
Schedule 95(BASE2) : 
--------> credited hours     : 65.9667
--------> schedule cost      : 6227
--------> number of vacations: 22
Schedule 96(BASE2) : 
--------> credited hours     : 75.5333
--------> schedule cost      : 6481
--------> number of vacations: 20
Schedule 97(BASE3) : 
--------> credited hours     : 78.55
--------> schedule cost      : 7892.67
--------> number of vacations: 17
Schedule 98(BASE2) : 
--------> credited hours     : 75.4333
--------> schedule cost      : 3652.67
--------> number of vacations: 22
Schedule 99(BASE2) : 
--------> credited hours     : 67.5
--------> schedule cost      : 4903
--------> number of vacations: 22
Schedule 100(BASE2) : 
--------> credited hours     : 80.15
--------> schedule cost      : 4748
--------> number of vacations: 20
Schedule 101(BASE2) : 
--------> credited hours     : 79.7167
--------> schedule cost      : 6248.33
--------> number of vacations: 19
Schedule 102(BASE1) : 
--------> credited hours     : 84.95
--------> schedule cost      : 5779.33
--------> number of vacations: 20
Schedule 103(BASE2) : 
--------> credited hours     : 82.4667
--------> schedule cost      : 5465.33
--------> number of vacations: 15
Schedule 104(BASE2) : 
--------> credited hours     : 68.65
--------> schedule cost      : 3411.67
--------> number of vacations: 22
Schedule 105(BASE3) : 
--------> credited hours     : 80.65
--------> schedule cost      : 9659.67
--------> number of vacations: 16
Schedule 106(BASE2) : 
--------> credited hours     : 73.4833
--------> schedule cost      : 5226.33
--------> number of vacations: 21
Schedule 107(BASE3) : 
--------> credited hours     : 83.0333
--------> schedule cost      : 6003.33
--------> number of vacations: 15
Schedule 108(BASE1) : 
--------> credited hours     : 82.05
--------> schedule cost      : 3475.67
--------> number of vacations: 20
Schedule 109(BASE1) : 
--------> credited hours     : 76.7333
--------> schedule cost      : 5413.33
--------> number of vacations: 13
Schedule 110(BASE3) : 
--------> credited hours     : 81.1
--------> schedule cost      : 5159
--------> number of vacations: 15
Schedule 111(BASE1) : 
--------> credited hours     : 66.55
--------> schedule cost      : 5167.33
--------> number of vacations: 22
Schedule 112(BASE2) : 
--------> credited hours     : 78.1167
--------> schedule cost      : 4346
--------> number of vacations: 20
Schedule 113(BASE1) : 
--------> credited hours     : 71.2333
--------> schedule cost      : 5290.67
--------> number of vacations: 18
Schedule 114(BASE2) : 
--------> credited hours     : 68.6167
--------> schedule cost      : 3883
--------> number of vacations: 22
Schedule 115(BASE3) : 
--------> credited hours     : 84.0667
--------> schedule cost      : 4356.67
--------> number of vacations: 16
Schedule 116(BASE2) : 
--------> credited hours     : 69.1
--------> schedule cost      : 6138
--------> number of vacations: 21
Schedule 117(BASE3) : 
--------> credited hours     : 73.7667
--------> schedule cost      : 6521
--------> number of vacations: 16
Schedule 118(BASE2) : 
--------> credited hours     : 77.6
--------> schedule cost      : 2293.33
--------> number of vacations: 22
Schedule 119(BASE1) : 
--------> credited hours     : 80.15
--------> schedule cost      : 6664.33
--------> number of vacations: 19
Schedule 120(BASE1) : 
--------> credited hours     : 81.1333
--------> schedule cost      : 7471
--------> number of vacations: 19
Schedule 121(BASE3) : 
--------> credited hours     : 64.7667
--------> schedule cost      : 5301.33
--------> number of vacations: 9
Schedule 122(BASE3) : 
--------> credited hours     : 74.6167
--------> schedule cost      : 6704.67
--------> number of vacations: 17
Schedule 123(BASE2) : 
--------> credited hours     : 84.6
--------> schedule cost      : 3536.33
--------> number of vacations: 21
Schedule 124(BASE3) : 
--------> credited hours     : 81.1167
--------> schedule cost      : 9315
--------> number of vacations: 15
Schedule 125(BASE2) : 
--------> credited hours     : 78.2667
--------> schedule cost      : 4358.33
--------> number of vacations: 21
Schedule 126(BASE2) : 
--------> credited hours     : 82.55
--------> schedule cost      : 4686.67
--------> number of vacations: 20
Schedule 127(BASE3) : 
--------> credited hours     : 84.1667
--------> schedule cost      : 5736.33
--------> number of vacations: 16
Schedule 128(BASE2) : 
--------> credited hours     : 77.5833
--------> schedule cost      : 6773.67
--------> number of vacations: 19
Schedule 129(BASE2) : 
--------> credited hours     : 79.9667
--------> schedule cost      : 6740
--------> number of vacations: 20
Schedule 130(BASE2) : 
--------> credited hours     : 66.15
--------> schedule cost      : 3993.33
--------> number of vacations: 22
Schedule 131(BASE3) : 
--------> credited hours     : 84.4833
--------> schedule cost      : 8210
--------> number of vacations: 16
Schedule 132(BASE2) : 
--------> credited hours     : 84.9
--------> schedule cost      : 4615
--------> number of vacations: 20
Schedule 133(BASE2) : 
--------> credited hours     : 68.3667
--------> schedule cost      : 3701
--------> number of vacations: 22
Schedule 134(BASE2) : 
--------> credited hours     : 84.8333
--------> schedule cost      : 4489
--------> number of vacations: 19
Schedule 135(BASE2) : 
--------> credited hours     : 67.5333
--------> schedule cost      : 3999
--------> number of vacations: 21
Schedule 136(BASE1) : 
--------> credited hours     : 59.7833
--------> schedule cost      : 4031
--------> number of vacations: 21
Schedule 137(BASE1) : 
--------> credited hours     : 70.9667
--------> schedule cost      : 4942
--------> number of vacations: 22
Schedule 138(BASE2) : 
--------> credited hours     : 80.5333
--------> schedule cost      : 6821.33
--------> number of vacations: 20
Schedule 139(BASE2) : 
--------> credited hours     : 72
--------> schedule cost      : 6055.33
--------> number of vacations: 21
Schedule 140(BASE2) : 
--------> credited hours     : 74.7833
--------> schedule cost      : 4239.67
--------> number of vacations: 21
Schedule 141(BASE1) : 
--------> credited hours     : 73.0833
--------> schedule cost      : 5236.67
--------> number of vacations: 22
Schedule 142(BASE1) : 
--------> credited hours     : 83.5333
--------> schedule cost      : 5242
--------> number of vacations: 20
Schedule 143(BASE1) : 
--------> credited hours     : 82.5333
--------> schedule cost      : 4077
--------> number of vacations: 20
Schedule 144(BASE3) : 
--------> credited hours     : 81.2
--------> schedule cost      : 5179.33
--------> number of vacations: 18
--------------------------------------------------------------
--------------------------------------------------------------
The average of the credited hours for this instance :74.6694
The average of the days off for this instance :19.1944
The minimum of the credited hours for this instance :23.6833
The maximum of the credited hours for this instance :84.95
--------------------------------------------------------------
--------------------------------------------------------------
--------------------------------------------------------------
The total cost for this instance   			:757058